Posted: Tue Sep 06, 2016 6:10 amPost subject: Base Condition For RCC building in ETABS |
|
|
While designing a Multi Storeyed RCC building with Lateral loads what is the preferable base conditions to be given for columns? (Hinged or Fixed) If a fixed condition is given are footings to be designed for the base moment also? Because with high earthquake load the base moment is very high and footing becomes uneconomical. |
|
Back to top |
|
|
Raza_Ahsan SEFI Member
Joined: 18 May 2016 Posts: 10
|
Posted: Tue Sep 06, 2016 9:11 amPost subject: Re: Base Condition For RCC building in ETABS |
|
|
You have to provide a Fix Support to the column at the base and footing will design accordingly.
Deepthi Darla wrote: |
While designing a Multi Storeyed RCC building with Lateral loads what is the preferable base conditions to be given for columns? (Hinged or Fixed) If a fixed condition is given are footings to be designed for the base moment also? Because with high earthquake load the base moment is very high and footing becomes uneconomical. |
|
|
Back to top |
|
|
BVRAO General Sponsor
Joined: 21 Sep 2009 Posts: 47
|
Posted: Tue Sep 06, 2016 3:12 pmPost subject: Re: Base Condition For RCC building in ETABS |
|
|
[quote="Raza_Ahsan"]You have to provide a Fix Support to the column at the base and footing will design accordingly.
Yes |
|
Back to top |
|
|
saikiran gone General Sponsor
Joined: 22 Apr 2016 Posts: 217
|
发布:2016年09年9月,星期五8:53Post subject: |
|
|
Hi Deepthi Darla,
You can model the structure with pinned connections, but the structure should safe in lateral deflection criteria. You should provide a connection with foundation detailing should be Pinned such that it should transfer axial load only no moment. Providing such connection in the site is not preferable.
So, it's better to consider the column base as fixed and design the foundation for respective moments and axial force.
with best, Saikiran. |
|
Back to top |
|
|
PPK SEFI Member
Joined: 14 Nov 2011 Posts: 15 Location: Jamshedpur Jharkhand
|
Posted: Sat Sep 10, 2016 6:02 am文章主题:一个钢筋混凝土的基本条件C framed structure |
|
|
Kindly refer to clause No. 3.15.1 of Reynolds RCC designer's handbook (10th edition)where the end condition considerations for a framed structure are clearly explained. |
|