www.www.buonovino.com

STRUCTURAL ENGINEERING FORUM OF INDIA [SEFI]

Forum SubscriptionsSubscriptionsDigestDigest PreferencesFAQFAQSearchSearchMemberlistMemberlistUsergroupsUsergroupsRegisterRegisterFAQSecurity TipsFAQDonate
ProfileProfileLog in to check your private messagesLog in to check your private messagesLog in to websiteLog in to websiteLog in to websiteLog in to forum
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses.
Use online scanners
here and here to upload downloaded attachment to check for safety.

clause 7.3.14_modelling building with podium

This forum is locked: you cannot post, reply to, or edit topics.This topic is locked: you cannot edit posts or make replies.Thank Post www.www.buonovino.com Forum Index->E-conference on IS 16700 13th March to 18th March 2018
View previous topic::View next topic
Author Message
hemalmistry
...
...


Joined: 01 Jul 2009
Posts: 70

PostPosted: Wed Mar 14, 2018 6:49 pmPost subject: clause 7.3.14_modelling building with podium Reply with quote

条款7.3.14需要模型多个塔智慧h single podium separately and integrally (fig 1B). Do we also need to model single tower with podium (fig. 1A) separately and integrally? Clause 8.1.3 applies to both fig 1A and 1B but modelling requirement is mentioned in cl. 7.3.14 and in cl. 8.1.3.3.3 (a) for fig. 1A only.
Back to top
View user's profileSend private message
ahujavipul
General Sponsor
General Sponsor


Joined: 26 Jan 2003
Posts: 230

PostPosted: Wed Mar 21, 2018 12:30 pmPost subject: clause 7.3.14_modelling building with podium Reply with quote

I think this issue has been answered by the moderators.

Though a bigger question still lingers. In a combined tower model what empirical time period should be taken & base and what should be the procedure for scaling.

我建议为目的的隔膜calculation, a static equivalent load be applied in opposite directions (or in various permutations) & then the stresses studied. The natural time period will only produce minimal response.

Regards

Vipul Ahuja
Back to top
View user's profileSend private message
hemalmistry
...
...


Joined: 01 Jul 2009
Posts: 70

PostPosted: Wed Mar 21, 2018 2:51 pmPost subject: Re: clause 7.3.14_modelling building with podium Reply with quote

Dear vipul sir,

Clause 8.1.3.3.3 (c) (2) says "equivalent static seismic forces can be used, provided they are scaled to match base overturning moments obtained from response spectrum analysis".

Above clause need explanation as it required to do reverse of what we are doing for individual tower model. Does this clause requires to use response spectrum method only as impirical time period for multitower model to be used for static method is not available ? And so if static method is to be used its base overturning moment (why not base shear) is to be matched with that of response spectrum method.

Also, clause 8.1.3.3.3 (c) (1) needs explation. How load combinations as required by this clause can be generated?

Regards
Hemal



ahujavipul wrote:
I think this issue has been answered by the moderators.

Though a bigger question still lingers. In a combined tower model what empirical time period should be taken & base and what should be the procedure for scaling.

我建议为目的的隔膜calculation, a static equivalent load be applied in opposite directions (or in various permutations) & then the stresses studied. The natural time period will only produce minimal response.

Regards

Vipul Ahuja
Back to top
View user's profileSend private message
ahujavipul
General Sponsor
General Sponsor


Joined: 26 Jan 2003
Posts: 230

PostPosted: Fri Mar 23, 2018 12:16 pmPost subject: clause 7.3.14_modelling building with podium Reply with quote

I agree, the basis for matching overturning moment rather than base shear is unclear, when the stretching force in the ground floor diaphragm (between--say two towers) is less dependent on overturning & more on the base shear of the two acting in opposite directions.

Regards

Vipul Ahuja
Back to top
View user's profileSend private message
Display posts from previous:
This forum is locked: you cannot post, reply to, or edit topics.This topic is locked: you cannot edit posts or make replies.Thank Post www.www.buonovino.com Forum Index->E-conference on IS 16700 13th March to 18th March 2018 All times are GMT
Page1of1



Jump to:
Youcannotpost new topics in this forum
Youcannotreply to topics in this forum
Youcannotedit your posts in this forum
Youcannotdelete your posts in this forum
Youcannotvote in polls in this forum
Youcannotattach files in this forum
Youcannotdownload files in this forum


© 2003, 2008 SEFINDIA,Indian Domain Registration
Publishing or acceptance of an advertisement is neither a guarantee nor endorsement of the advertiser's product or service.advertisement policy
Baidu
map