www.www.buonovino.com

STRUCTURAL ENGINEERING FORUM OF INDIA [SEFI]

Forum SubscriptionsSubscriptionsDigestDigest PreferencesFAQFAQSearchSearchMemberlistMemberlistUsergroupsUsergroupsRegisterRegisterFAQ安全提示FAQDonate
ProfileProfileLog in to check your private messagesLog in to check your private messagesLog in to websiteLog in to websiteLog in to websiteLog in to forum
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses.
Use online scanners
here and here to upload downloaded attachment to check for safety.

Casting in two different grades of concrete

Post new topicReply to topicThank Post www.www.buonovino.com Forum Index->Speak Out Box
View previous topic::View next topic
Author Message
sspawar
...
...


Joined: 05 Jun 2009
Posts: 1199

PostPosted: Thu Aug 04, 2022 11:03 amPost subject: Casting in two different grades of concrete Reply with quote

Dear Sefians,


What is the best economic and quality controlled method to cast numerous columns' and beams' joints where the grade of concrete of Beam is if M30 and columns continue for upper floors of M40?

There is heavy reinforcement in columns and beams.


Best Regards
Back to top
View user's profileSend private message
vikram.jeet
General Sponsor
General Sponsor


Joined: 26 Jan 2003
帖子:3699

PostPosted: Sat Aug 06, 2022 3:40 pmPost subject: Reply with quote

Past Discussion on this is reproduced hereinunder :
aksharmacpwd wrote:
Dear All,

The practice being followed in CPWD is shared with SEFI community:
1. Provide specified concrete mix (i.e. richer mix) at column location.
2. This richer mix also simultaneously laid upto twice beam depth from column face .
3. Richer mix concrete was manufactured and laid prior to manufacture of lower grade concrete.
This is what we used to specify in structural drawings and also execute at site.

Anil K Sharma

--- OnFri, 10/17/08, vikram.jeetwrote:

Quote:
From: vikram.jeet
Subject: [SEFI] Re: Concerte grade at beam-column jucntion
To:general@www.buonovino.com
Date: Friday, October 17, 2008, 1:03 PM

Concrete at beam column junction

I think we may not encourage the site to use a lower mix
at the junction. Approach of using the column mix(higher mix) at
junction will be appropriate. A higher mix (of column) could be
prepared first and junctions could be filled in the begining of
concreting. In high rise constructions the differential in column
mixes vs Beam /slabsMix will always be there being dictated by
the design requirements

Regards

vikramjeet







__________________________________________________
Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

Posted via Email
Back to top
View user's profileSend private message
sspawar
...
...


Joined: 05 Jun 2009
Posts: 1199

Post发布:太阳07年8月,2022年6:58 amPost subject: Reply with quote

Dear Sir,
I found a You tube upload related to this topic, have a very deep, study over, touched many aspects in that regards. Have a look, hope will get some information extra ordinary.
Regards



https://youtu.be/c3kU-nKy5OQ
Back to top
View user's profileSend private message
Display posts from previous:
Post new topicReply to topicThank Post www.www.buonovino.com Forum Index->Speak Out Box All times are GMT
Page1of1



Jump to:
You可以notpost new topics in this forum
You可以notreply to topics in this forum
You可以notedit your posts in this forum
You可以notdelete your posts in this forum
You可以notvote in polls in this forum
You可以notattach files in this forum
You可以download files in this forum


© 2003, 2008 SEFINDIA,Indian Domain Registration
出版或验收of an advertisement is neither a guarantee nor endorsement of the advertiser's product or service.advertisement policy
Baidu
map