View previous topic::View next topic |
Author |
Message |
SunilJaitley General Sponsor
Joined: 10 Mar 2012 Posts: 26
|
Posted: Mon Mar 19, 2012 1:53 pmPost subject: Methodology fordeep excavation for protecting adj buiding |
|
|
A building with 3 basements is to be constructed adjoining an existing building 10m away.May advice methodology and safety steps. Soil is sandy Clay with angle of repose of 25 degrees. SunilJaitley jaitley02@gmail.com |
|
Back to top |
|
|
Dr. N. Subramanian General Sponsor
Joined: 21 Feb 2008 Posts: 5524 Location: Gaithersburg, MD, U.S.A.
|
Posted: Tue Mar 20, 2012 9:11 pmPost subject: Re: Methodology fordeep excavation for protecting adj buidi |
|
|
Dear Er Sunil,
You may use Soil nailing-Seehttp://www.geosystemsbruce.com/v20/biblio/1986_soilNailing_applicationPractice.pdf
Best wishes NS
SunilJaitley wrote: |
A building with 3 basements is to be constructed adjoining an existing building 10m away.May advice methodology and safety steps. Soil is sandy Clay with angle of repose of 25 degrees. SunilJaitley jaitley02@gmail.com |
|
|
Back to top |
|
|
SunilJaitley General Sponsor
Joined: 10 Mar 2012 Posts: 26
|
Posted: Wed Mar 21, 2012 4:47 pmPost subject: Re:Methodology for deep excavation |
|
|
Respected Dr Subramanium Thanks a lot for guidance and for providing valuable information on the subject.Other SEFIans will also be benefitted. SunilJaitley jaitley02@gmail.com |
|
Back to top |
|
|
|